COAL-HANDLING
process
From the track hopper 200mm coal is transferred to the
conveyor via paddle feeder and finally sent to the crusher house.
In the Crusher House the
vibrating screen sends the coal having size of less than 20mm to belt feeder through the bypass chute
bypassing the crusher and sends the coal of more than 20mm size to the crusher.
PICTURES ABOVE ARE OF COAL CRUSHERS
VIBRATING SCREEN
COAL MILL
Ø Because
of pulverization following advantages are drawn.
1. Better Air -
Coal fuel ratio.
2. Better flame
stability
3. Effective
utilization of carbon.
4. Efficient use of
low grade coal in Boiler.
5. Reliable, safe
and flexible operation.
6. All the above will
increase the efficiency of the boiler
v
GRINDING PROCESS OF MILLS.
·
Coal are fed from raw coal feeder (situated just above the mill on
concrete floor). One end of the raw coal feeder is attached with Coal bunker
through a coal gate.
·
Raw coal feeder is having a
travelling belt with coal weighing instruments. Coal from travelling belt of
raw coal feeder drops in central feed pipe (connection between Raw Coal Feeder
and Mill).
·
After coal reaches Mill bowl grinding started and hot air also been given
to make the pulverized fuel dried enough to classifier chamber. The portion of
the coal which cannot be grinded finds its way to mill reject.
·
Mechanical setting is to be carried out for minimum rejects. Zero rejects
also is not good as it causes excessive wear and tear of the mills.
·
Once the fuel air mixture reaches classifier it will again classified into
two parts one part which heavier part will go back to mill for further grinding
other part will directly go to furnace through four coal pipes and MDV (Mill
discharge valves).
COAL MILL
v
COAL VARIATION IN INDIA
ü
Moisture 5 to 30 %
ü
Ash 10 to 55%
ü
Volatile matters 12 to 40%
ü
Abrasion Index mg/kg 60 to 125
ü
Hard Groove Index(HGI) 45 to 110
v EFFECTS OF COAL ELEMENT ON MILL
CHOICE AND SIZING
· MOISTURE -
More hot air is required to dry the coal particles.
· VOLATILE MATTERS-
Determine temperature of Mill outlet and furnace.
· ASH - Grinding
element; coating on rollers etc.
· HGI - Grind ability
v
NOMENCLATURE OF BOWL MILLS
v
FOR XRP xxxx ( e.g. 803 /883)
ü
X stands for Frequency of Power Supply (50 Hz for India)
ü
R stands for Raymond (inventor
of Bowl Mill)
ü
P stands for Pressurized
Mill with Primary Air Fan
ü
100/110 stands for Bowl diameter
(inches) (in case of xrp1003 /xrp 1103)
ü
3 stands for Number
of grinding Roller.
v
STANDARD MILL CAPACITY
In NTPC
Farakka XRP 803 and XRP 883 bowl
v MILL
SIZE CAPACITY (COAL GRINDING)
ü XRP
623 18 + TPH
ü XRP
703 26 + TPH
ü XRP
763 33.8 TPH
ü XRP
783 36.5 TPH
ü XRP
803 39.8 TPH
ü XRP
883 51 + TPH
ü XRP
903 54+ TPH
ü XRP
1003 68 .1 TPH
ü XRP
1103 HP 91 + TPH